| The success of A² is directly related to the quality of its services and products. As part of our Total Quality Management philosophy, we have established Quality Controls/Assurance Plans on our projects. The results have provided our clients and the public with quality service and projects. The quality of our work provides essential customer value, which attracts and retains customers. |
|
| Greenscapes
|
 |
Burial Crypt Area - South Florida National Cemetery
West Palm Beach, FL
Our firm was awarded a contract with the Department of Veteran Affairs for the Burial Area Crypts at Burial Areas 38 & 39 at the South Florida National Cemetery in West Palm Beach, Florida. The work included acquisition, transportation, and installation of four thousand two hundred fifty (4,250) double depth precast concrete crypts, surveying, layout, excavation, grading, loading/ hauling, temporary staging/storage area, spreading of excavated materials, de-watering, site work, drainage system, installation of irrigation system, backfilling, and landscaping. |
 |
Dinky Line Trail and Boardwalk
Orlando, FL
Our firm provided pre-construction services to the City of Orlando for the Dinky Line Project. This project is located on the east side of Lake Formosa. The main component of this project consisted of a boardwalk that curves around on the backside of the Mennello Museum of American Folk Art. |
 |
Lake Eola Park
Orlando, FL
Lake Eola Park is located in downtown Orlando and is classified as a regional park. The park is about 43 acres, with most of it being water. |
 |
Puerto Rico National Cemetery
Bayamon, PR
Our firm has a contract with the Department of Veteran Affairs for the Design/Build and Development of the Burial Area-Crypt Installation at Section NN of the Puerto Rico National Cemetery. The cemetery is situated on 108.2 acres of which 77.31 are being developed. The cemetery accommodates casketed and cremated remains. |
 |
Rotary Park Improvements
Hollywood, FL
Our firm provided pre-construction services for this project consisting of site improvements to the 15.34-acre existing park, which holds eight baseball fields with dugouts, bleachers, batting cages and two concession/storage buildings. Works and improvements include: demolition concession buildings, renovation of utilities, new drainage systems, fill and grade of fields, new landscaping including clay mix for baseball diamonds and Bermuda grass for the fields, a new irrigation system, new concrete walkways, new fencing, re-paving of the parking lots, updating the electrical system, and construction of a new concession/storage building and playground area. |
 |
Development of the Fast Track Area at the South Florida National Cemetery (Phase 1A)
West Palm Beach, FL
Our firm was contracted by the Department of Veteran Affairs for the Development of the Fast Track Area at the South Florida National Cemetery (Phase 1A) in West Palm Beach, Florida. The work included the development of 57 acres on a 313-acre site, a committal shelter, entrance drive, administration and maintenance complex and trailers, burial areas containing 5,535 traditional grave sites and 5,204 sites for the in-ground interment of cremated remains, flag-assembly area, site signage and furnishings, grading, drainage, well installation, irrigation system, exotic plant treatment, tree relocations, general utilities, landscape and hardscape features, enhancement and preservation of existing wetland and uplands habitat. As part of the USACE and SFWMD permit requirements, we restored an existing wetland to its preexisting conditions. This entailed removing of exotic plant and providing proper mitigation procedures to restore the wetland area. The site contained the following environmentally sensitive areas to be protected: wetland preserve, gopher tortoise preserve, upland habitats, forested wetlands, cypress domes, and buffer areas. Permit conditions required the protection of certain fish and wildlife resources such as gopher tortoise, eastern indigo snake (drymarchon corais couperi), and a nesting bald eagle. We acquired and build out a total of three (3) modular buildings: an administration building 23'-4" x 44'-0", maintenance building 23'-4" x 44'-0" and a restroom facility 11'-8" x 32'-0". |
|
| |
| |
|
|
|
|